Order or ask a question0113 240 0920 Basket0
Home / Halstead / QUATTRO / 500565

Halstead ELECTRODE - IGNITION - LONG LEAD

Part number500565
ManufacturerHalstead
ConditionNew, genuine part

Fits these models

Always check the part number against your old part or the boiler manual before ordering.

Other parts for the QUATTRO

Prices include VAT. Delivery £12.60 inc VAT per order. Delivery options

Part no.DescriptionPrice
450956 BURNER MANIFOLD CVI Call for price
300636 KNOB MOULDING £8.29 inc VAT£6.91 ex VAT
450904 PRIMARY HEAT EXCHANGER Call for price
300641 15MM ISOLATION VALVE Call for price
500576 DIVERTER VALVE MICRO SWITCH COVER £0.54 inc VAT£0.45 ex VAT
500575 DIVERTER VALVE MICRO SWITCH £39.35 inc VAT£32.79 ex VAT
450903 TRIO CALORIFIC £161.09 inc VAT£134.24 ex VAT
550515 PUMP OVERRUN THERMOSTAT THERMODISC Call for price