Halstead ELECTRODE - DETECTION - LONG LEAD
| Part number | 500566 |
|---|---|
| Manufacturer | Halstead |
| Condition | New, genuine part |
Fits these models
Always check the part number against your old part or the boiler manual before ordering.
Other parts for the QUATTRO
Prices include VAT. Delivery £12.60 inc VAT per order. Delivery options
| Part no. | Description | Price | |
|---|---|---|---|
| 300707 | 22MM ISOLATION VALVE WITH DRAIN OFF | Call for price | |
| 500581 | IGNITION PCB S456 DD1003 CVI | £164.47 inc VAT£137.06 ex VAT | |
| 550514 | PRESSURE GAUGE | £45.70 inc VAT£38.08 ex VAT | |
| 450908 | AUTO AIR VENT - ALTECNIC CA502630 - 3/8 INCH | £25.90 inc VAT£21.58 ex VAT | |
| 500576 | DIVERTER VALVE MICRO SWITCH COVER | £0.54 inc VAT£0.45 ex VAT | |
| 101019 | OVERHEAT CUT OFF DEVICE RESET TUBE | Call for price | |
| 450906 | PRESSURE RELIEF VALVE 3 BAR | Call for price | |
| 700515 | BURNER ASSEMBLY | Call for price |